

In 2011 Aircon GmbH & Co. KG announced that it has received MCS certification for its Aircon 10S.
This ensures that operators of windturbines with Aircon 10S will be able to benefit from UK feed-in subsidies.
The »Power and Performance Test« and the »Duration Test« were done by engineering office Dr.-Ing. Frey. The »Report of accoustical emissions« was created by GL Garrad Hassan Deutschland GmbH with Report No.: GLGH-4286 11 07736 258-A-0001-A.
Find whole Report »Summary Details for Performance, Duration and Acoustic Measurements« as PDF here.